TO TOP

Interaction Chains 4: The sustainability-driven process

The use of elements extracted from existing source buildings, for the design and construction of new buildings in an ecologically optimized way, requires an extensive chain of processes. Interaction chain 4 focuses on facilitating these processes from the identification of elements for reuse, the management of their extraction, the coordination with refurbishment processes, and, above all, on evaluating the sustainability of alternative solutions. The main sub-projects involved in IC 4 areA01, B02, C01, C02, C03 and C04. Later, further sub-projects (A02, A03, A04 and B04) will be involved.

The initial aim of IC 4 is to develop a digital process chain for dismantling, handling, production and environmental sustainability. Through this interaction chain, the sub-projects from project group C (process methods for sustainable reuse) will be linked with the characterization methods of the existing source structure in B02 , which will be decisive for the suitability for the extraction of elements. Another very important link will be with the design of a new structure in A01, resulting in a deconstruction pattern of a source structure towards a best possible supply of reusable elements to fulfil the demands of the new design.

Coordinator

Publications